Timeline for Project Execution

Nov. 2nd- Finalize which type of sensor I’m going to use; get feedback about knitting patterns and what kind of materials I should use; think about possible implications/concepts behind various types of glove patterns

Nov. 3rd- Have electronics supplies ordered

Nov. 9th- Have all supplies known at present bought, except for LEDs; have swatch of knitting completed; have a glove pattern decided on and acquired and knitting on the main gauntlet started; if possible (if supplies arrive) have circuit ready for testing on a breadboard; determine number and kind of LEDs needed; start thinking about display

Nov. 16th- Have circuit ready for testing; have finger “sleeves” finished being knit and test conductivity; more progress on main gauntlets; have programming/processing with the Arduino underway; have display method decided on; order flora and LEDs

Nov. 23rd- Keep working on everything

Nov. 24th- Eat lots of turkey

Nov. 30th- Have all knitting completed; have all testing completed, programming/processing completed, and all circuits ready to be “installed” into gloves; have LED attachment to gloves underway; determine size that the photos for display should be

Dec. 6th- Have gloves completed; document gloves in action; get photos printed

Dec. 7th- Gloves completed; display completed, including photo documentation of gloves in action

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s